San Diego Gas & Electric Company's Sunrise Powerlink Project

22 Documents in Project

Summary

SCH Number
2006091071
Lead Agency
Public Utilities Commission (California Public Utilities Commission)
Document Title
San Diego Gas & Electric Company's Sunrise Powerlink Project
Document Type
NOD - Notice of Determination
Received

Document Description
Beta Engineering California (Beta Engineering) filed a temporary permit application of behalf of San Diego Gas and Electric Company (San Diego) under Water Code section 1425. Beta Engineering requires a temporary water supply for earthwork and dust control uses for the Suncrest Powerlink Project, an electrical substation proposed for construction by San Diego. The subject water source is two existing reservoirs located on a neighboring parcel to the project site, owned by Dean and Deborah Wilson. Water will be withdrawn from the reservoirs and conveyed to the electrical substation site using temporary piping, placed on the ground along the existing Bell Buff Truck Trail. This project will result in only minor alterations to land.

Contact Information
Billie C. Blanchard
State Water Resources Control Board
Division of Water Rights P.O. Box 2000
Sacramento, CA 95812-2000

866-849-8390

Location

Cities
San Diego El Centro
Counties
San Diego Imperial
Cross Streets
Numerous in Imperial and San Diego Counties
State Highways
S22, S2, SR78 and others
Railways
Numerous
Airports
Numerous
Schools
Numerous
Waterways
Numerous
Other Location Info
City/Nearest Community: Boulevard

Notice of Determination

Approving Agency
State Water Resources Control Board, Division of Water Rights
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
CPUC 770 L Street, Suite 1050 Sacramento, CA 95812

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search