San Diego Gas & Electric Company's Sunrise Powerlink Project

22 Documents in Project

Summary

SCH Number
2006091071
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
San Diego Gas & Electric Company's Sunrise Powerlink Project
Document Type
NOD - Notice of Determination
Received
Posted
4/30/2009
Document Description
The proposed project as approved by the California Public Utilities Commission involves the construction of the Final Environmentally Superior Southern Route Alternative, which would include a 500kV transmission line from the Imperial Valley Substation to a new substation southeast of the town of Alpine, then continuing with a 230 kV transmission line with both overhead and underground components to the Sycamore Canyon Substation. Upgradess to the existing transmission system west of Sycamore Canyon would also occur. The project would involve extension of the 500 kV transmission line across a protion of McCain Valley Conservation Camp. The California Department of Corrections and Rehabilitation (CDCR) would grant a Right of Entry for geotechnical testing and a Utilitiy Easment for a 200 ft wide corridor ~1200 ft in length for construction of transmission line facilities. The project, as described and analyzed in the project EIR/EIS, includes improvements on CDCR land that would include an access road, one transmission structure (lattice tower) and 500 kV overhead transmission lines. Mitigation measures as identified in the required Statement of Findings for San Diego Gas & Electric Company's Sunrise Powerlink Project (Applications A.05-12-014 and A.06-08-010) Final EIR/EIS and Draft Land Use Amendment have been incorporated as required into the project's Mitigation Monitoring Program as a condition of project approval. CDCR in its capacity as a REsponsible Agency is not required to adopt and'or implement additional mitigation measures beyond those adopted by the Lead Agency.

Contact Information

Name
Nancy MacKenzie
Agency Name
Department of Corrections and Rehabilitation
Contact Types
Lead/Public Agency

Location

Cities
El Centro, San Diego
Counties
Imperial, San Diego
Cross Streets
Numerous in Imperial and San Diego Counties
State Highways
S22, S2, SR78 and others
Railways
Numerous
Airports
Numerous
Schools
Numerous
Waterways
Numerous
Other Location Info
City/Nearest Community: Boulevard

Notice of Determination

Approving Agency
CDCR
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print