Freestone Flat Road Improvement

Summary

SCH Number
2006089081
Lead Agency
Sonoma County
Document Title
Freestone Flat Road Improvement
Document Type
NOD - Notice of Determination
Received
Posted
9/7/2006
Document Description
The project involves the improvement of an existing road, several elements including the installation of approximately 90 liner feet of steel sheet piles along sections within the top of the bank of Salmon Creek in order to provide a base for the widening of Freestone Flat Road. The project site is located within and around the riparian zone of Salmon Creek on Freestone Flat Road near the intersection of Bohemian Highway in the town of Freestone, Sonoma County of the Camp Meeker 7.5 minute U.S. Geological Survey quadrangle. The operator proposes to trim and remove areas of the riparian zone to accommodate the placement of the sheet piles likely utilizing an excavator and/or backhoe and dumpster for removal of vegetation and soil/fill outside of the immediate riparian zone of Salmon Creek. The riparian zone of Salmon Creek at this location currently consists of a mix of native and non-native plant species and trees. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement number 1600-2006-0144-3 pursuant to Section 1602 of the Fish and Game Code to the project operator, Bill Phelps / New West, LLC.

Contact Information

Name
Jeremy Sarrow
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Sonoma
Other Location Info
Town of Freestone

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.