Interim Measure Soil Vapor Extraction System, Boeing - Torrance Facility

Summary

SCH Number
2006088247
Public Agency
Department of Toxic Substances Control
Document Title
Interim Measure Soil Vapor Extraction System, Boeing - Torrance Facility
Document Type
NOE - Notice of Exemption
Received
Posted
8/22/2006
Document Description
The project consists of a soil vapor extraction (SVE) system at the Former Electron Dynamics Division (EDD) site located in the City of Torrance, California. The SVE testing will be implemented in two phases, an initial short-term SVE testing phase and an interim measure SVE phase. The details of the pilot test and interim measures are provided in the Soil Vapor Extraction Pilot Test and Interim Measures Workplan (Workplan).

Contact Information

Name
Peter Bailey
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Torrance
Counties
Los Angeles

Notice of Exemption

Exempt Status
Other
Type, Section or Code
15061
Reasons for Exemption
The Initial Short-Term SVE Testing (Phase) I) and the Interim Measure Operation (Phase II) are intended to remove elevated concentrations of VOCs from soil in a manner absent of potential environmental effects.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print