TPM 20778RPL^3, Log No. 03-20-007; Pijnenburg

2 Documents in Project

Summary

SCH Number
2006081161
Lead Agency
San Diego County
Document Title
TPM 20778RPL^3, Log No. 03-20-007; Pijnenburg
Document Type
NOD - Notice of Determination
Received
Posted
8/10/2009
Present Land Use
There is a drainage on-site that qualifies as an RPO wetland which drains into Potrero Creek that runs off-site parallel to the northern property boundary. Highway 94 bisects the property and there are steep slope lands south of Highway 94. The site is immediately adjacent to MSCP preserve lands, south of Highway 94 and to the west.
Document Description
The project proposes a minor subdivision of 76.4 gross acres into four parcels and a remainder ranging in size from 8.8 to 23.7 gross acres. Construction associated with the subdivision includes four new pads, driveways, septic fields and fire clearing. There is an existing residence on proposed Parcel 2 that is to remain. Grading associated with the project includes a balanced cut and fill of approximately 9,200 cubic yards. The project site is groundwater dependent. Access to parcels 1 through 3 is from Barrett Smith Road. Access to Parcel 4 and the remainder parcel is from Highway 94.

Contact Information

Name
Marisa Smith
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Hwy. 94
Parcel #
652-030-02
State Highways
94
Waterways
Potrero Creek
Township
18S
Range
3E
Section
16
Other Location Info
City/Community: Dulzura 21321 Barrett Smith Road

Notice of Determination

Approving Agency
County of San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.