Swaim Subdivision; TM 5356RPL, ER #04-14-005 - Adlai Road/Swaim Project

3 Documents in Project

Summary

SCH Number
2006081102
Lead Agency
San Diego County
Document Title
Swaim Subdivision; TM 5356RPL, ER #04-14-005 - Adlai Road/Swaim Project
Document Type
NOD - Notice of Determination
Received
Posted
12/12/2014
Present Land Use
The site is undeveloped and is zoned RS3.
Document Description
CDFW is intending to execute a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code (#1600-2008-0110-R5) to the project applicant, Ron Swaim. The project proposes to alter the stream in order to construct the Adlai Road/Swaim project, a major subdivision of a 4.54-acre parcel into nine single family lots with required roads, utilities, and other improvements. Project activities consist of the installation of approximately 238 linear feet of 48-inch reinforced concrete pipe to convey the stream from the existing culvert through the project site to the southern property line, where it will discharge through a rock dissipater to the existing stream channel south of the site. Approximately 4,000 cubic yards of fill will be used to create building pads, driveways, and a road over the newly-installed culvert.

Contact Information

Name
Kelly Fisher
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
Vencinio del Este Place / Adlai Road
Parcel #
398-390-19-00
State Highways
I-8
Schools
Lakeview ES
Township
15S
Range
1E
Base
SBM
Other Location Info
City/Community: Lakeside 9288 Adlai Road

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print