Twin Lakes Pump Station Expansion and Emergency Pipeline Connection Project

2 Documents in Project

Summary

SCH Number
2006081006
Lead Agency
Las Virgenes Municipal Water District
Document Title
Twin Lakes Pump Station Expansion and Emergency Pipeline Connection Project
Document Type
NOD - Notice of Determination
Received
Posted
10/2/2006
Present Land Use
GP: Public Facilities, Open Space, and Single and Multi-Family Residential Z: OS-IXL and RA-1
Document Description
The proposed project involves the concurrent development of (1) the expansion of the LVMWD Twin Lakes Pump Station, (2) the installation of a 10-inch pipeline between the pump station and a meter vault, (3) the installation of a 14-inch intertie pipeline between the meter vault and 10-inch pipeline at Devonshire Street and Valley Circle Boulevard, and (4) the replacement of an eight-inch pipeline with a 12-inch pipeline between the meter vault and West Valley Feeder No. 2, located approximately 180 feet to the southeast of the project in Chatsworth Park South.

Contact Information

Name
C. Eugene Talmadge
Agency Name
Las Virgenes Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Devonshire Street, Valley Circle Boulevard
Parcel #
2723-010-900, 904
Township
2N
Range
17W
Section
13

Notice of Determination

Approving Agency
Las Virgenes Municipal Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print