Renewal of Waste Discharge Requirements (WDRs) for Injection of Treated Groundwater
2 Documents in Project
Summary
SCH Number
2006081005
Lead Agency
Regional Water Quality Control Board, Region 7 (Colorado River Basin), Palm Desert
Document Title
Renewal of Waste Discharge Requirements (WDRs) for Injection of Treated Groundwater
Document Type
NOD - Notice of Determination
Received
Posted
9/25/2006
Present Land Use
Resource Conservation (RC)
Document Description
The project consists of the renewal of Waste Discharge Requirements (WDRs) regulating the injection of treated water from existing groundwater treatment facilities and injection system. The pump and treat system currently in operation is used to treat groundwater contaminated with hexavalent chromium (Chromium VI). The groundwater treatment facilities and injection system are owned and operated by PG&E, and are located approximately 15 miles southeast of Needles, CA, near the PG&E Control Board (Regional Board) would allow for the continued injection of treated water during operation of the groundwater treatment facilities would be constructed or expanded and no change to the existing groundwater treatment facility operations would occur as a result of renewal of the WDRs.
Contact Information
Name
Jose Cortez
Agency Name
Regional Water Quality Control Board, Region 7 (Colorado River B
Contact Types
Lead/Public Agency
Phone
Location
Cities
Needles
Counties
San Bernardino
Cross Streets
Northeast of I-40 and Park Moabi Road
Parcel #
0650-151-06
State Highways
I-40
Railways
BNSF
Waterways
Colorado River
Township
7N
Range
24E
Section
5, 8
Base
SB
Notice of Determination
Approving Agency
Colorado River Basin Regional Water Quality Control Board
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.