Altamont Commuter Express Project

Summary

SCH Number
2006078162
Public Agency
San Joaquin Regional Rail Commission
Document Title
Altamont Commuter Express Project
Document Type
NOE - Notice of Exemption
Received
Posted
7/18/2006
Document Description
The proposed project is the installation of underground electrical conduit within UPRR right-of-way to provide electricity to the railroad signals necessary for the establishment of passenger train service along this portion of UPRR track. The project would begin approximately 100 feet west of the intersection of Dyer Road and the UPRR ROW and extend approximately 4,500 feet in a northeasterly direction entirely within the ROW. The electrical conduit would be directionally drilled (bored) under Dyer Road. West of Dyer Road, the conduit would be direct buried (installed with a trencher and backfilled) within the UPRR ROW. The UPRR ROW is situated upslope of an adjacent drainage. To protect the drainage, construction is proposed for the dry season and includes the installation of straw wattles on the downstream side of the UPRR ROW for the purpose of capturing and filtering sediment laden runoff that would result from an unexpected rainfall event.

Contact Information

Name
Brian Schmidt
Agency Name
San Joaquin Regional Rail Commission
Contact Types
Lead/Public Agency

Location

Counties
Alameda

Notice of Exemption

Exempt Status
Statutory Exemption
Type, Section or Code
Section 21080(b)(10)
Reasons for Exemption
Project consists of actions to provide passenger service within an existing rail right-of-way.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print