Township 9 Project (formerly Capitol Station 65)
6 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2006072077
- Lead Agency
- Sacramento, City of (City of Sacramento)
- Document Title
- Township 9 Project (formerly Capitol Station 65)
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 7/29/2014
- Present Land Use
- The City of Sacramento's General Plan land use designation for the project site is Special Planning District (SPD). Surrounding land uses consist of the American River to the North, industrial uses to the south, industrial/office use to the east, and industrial to the west. The site is predominately covered with impervious surface. Existing uses on the site include industrial and warehouse uses. All existing structures on the project site, totaling approximately 104 million square feet, would be demolished to accommodate the proposed project.
- Document Description
- To plant vegetation, perform landscaping, install an irrigation system and construct park features on the aldnslide slope of the levee.
- Contact Information
-
James Herota
Central Valley Flood Protection Board
3310 El Camino Avenue Room 151
Sacramento, CA 95821
Phone : (916) 574-0651
Location
- Cities
- Sacramento
- Counties
- Sacramento
- Cross Streets
- Richards Boulevard between 5th and 7th Streets
- Total Acres
- 65
- Parcel #
- 001-0020-003, 014, 019, 033, 034, 036, 041, 044, 046
- State Highways
- 5, 160, 80, 99
- Railways
- Southern Pacific
- Schools
- Sacramento Unified
- Waterways
- American River, Sacramento River
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3310 El Camino Avenue Rm. 151, Sacramento, CA 95821.
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.