Soquel Creek Water District Well Master Plan

9 Documents in Project

Summary

SCH Number
2006072018
Lead Agency
Soquel Creek Water District
Document Title
Soquel Creek Water District Well Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
2/25/2015
Present Land Use
O'Neill Ranch- currently undeveloped/Community Commercial zoning designations. Cunnison Lane - currently undeveloped/Single-Family Residential zoning designation Austrian Way - water supply facility/Residential Agriculture zoning designation Granite Wat-Aptos Village - currently undeveloped/Community Commercial zoning designation Polo Grounds- parks and recreation/Park zoning designation.
Document Description
The State Water Resources Control Board (Board), as the Responsible Agency, will be issuing a water supply permit to operate to Soquel Creek Water District (SqCWD). The proposed project is to implement the Well Master Plan (WMP) project to improve redundancy and flexibility in the SqCWD's water production and distribution system while redistributing pumping away from coastal and depressed groundwater areas. The WMP proposes a phased approach for adding five groundwater production wells to the SqWCD system. The WMP also proposes converting an existing irrigation well at Polo Grounds Regional park to a municipal well. Auxiliary improvements related to the five proposed wells include new pipelines and water treatment facilities. The SwCWD also proposed to abandon and destroy one deteriorating production well and remove two existing production wells from service and maintain those wells as inactive wells. Implantation of the WMP would not increase ground water pumping, but would allow SQCWD to redistribute groundwater pumping to achieve more uniform drawdown, reduce susceptibility to seawater intrusion, and minimize localized pumping depression. Implementation of the WMP would likely occur over a five-year period, with one new well constructed each year.

Contact Information

Name
Jan Sweigert
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Cities
Capitola
Counties
Santa Cruz
Cross Streets
41st Ave/Soquel Dr; Cunnison Ln/Soquel Dr; Austrian Wy & Jennifer Dr; Granite Wy & Village Dr...
Zip
95073/003
Total Acres
4.9
Parcel #
03-034-110, 37-10-168, 04-046-106, 04-101-120, 04-120-104
State Highways
Hwy 1 & 17
Railways
Santa Cruz
Airports
No
Schools
Soquel High, Aptos High, Soquel Elem, Valencia Elem
Waterways
Soquel Creek, Aptos Creek, Valencia Creek, Noble Gulch
Other Location Info
City/Nearest Community: Soquel, Aptos
Other Information
Cross streets Continued: North Pole Drive & South Pole Drive. Lat/Long cont. 36-59-27.7434/121-56-33.252, 36-59-33.2154/121-54-39.8874, 36-58-47.796/121-54-8.208, 36-58-59.554/121-52-30.9354.

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print