Soquel Creek Water District Well Master Plan Addendum and Cunnison-Tannery Well Site Centralized Water Treatment Plant Pipeline Project

10 Documents in Project

Summary

SCH Number
2006072018
Lead Agency
Soquel Creek Water District
Document Title
Soquel Creek Water District Well Master Plan Addendum and Cunnison-Tannery Well Site Centralized Water Treatment Plant Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
12/19/2024
Document Description
On February 18, 2011, the Environmental Impact Report (EIR) for the Well Master Plan was approved and adopted by the Soquel Creek Water District Board of Directors (Board), and findings and a mitigation monitoring and reporting program were also adopted pursuant to Resolution 11-08. An Addendum to the EIR was prepared by the District for this Project. On December 17, 2024, the Board adopted Resolution 24-18 that approved the Addendum to the Well Master Plan EIR for the Project. The Board also adopted Resolution 24-19 which calls for sealed bids for the Project no later than January 15, 2025 for furnishing all labor, materials, equipment, and services for the construction of improvements designated as CWO 23-0101 Cunnison-Tannery Well Site Centralized Water Treatment Plant Pipeline. The Board found that the Project necessitated only minor modifications to the EIR. Therefore, pursuant to State CEQA Guidelines section 15164 and Public Resources Code section 21166, an Addendum to the EIR is the appropriate document and the preparation of a subsequent or supplemental EIR is not required for the Project as the Board found that the Project will not result in substantial changes that would require major revisions of the Final EIR due to the involvement of new significant environmental efforts or a substantial increase in the severity of previously identified significant effect. The Board also found that the Project will not result in substantial changes with respect to the circumstances under which the Project id developed that would require major revisions to the EIR due to the improvement of new significant environmental effects or a substantial increase in the severity of the previously identified significant effects. The Addendum does not present new information of substantial importance that was not known or could not have been known with the exercise of reasonable diligence at the time the EIR documents were certified. The Soquel Creek Water District (District), with the assistance of Black and Veatch, has prepared plans and specifications and bid documents for certain improvements related to the Well Master Plan that are entitled and known as the Cunnison-Tannery Well Site Centralized Water Treatment Plant Pipeline Project, 23-0101 (Project). The work to be done for the Project includes installation of 2,260 LF of 12” PVC mainline, installation of one new fire hydrant, associated testing and inspection and pavement restoration. On December 17, 2024, the Board approved the District to solicit bids for this work.

Contact Information

Name
Taj Dufour
Agency Name
Soquel Creek Water District
Job Title
Engineering Manager/Chief Engineer
Contact Types
Lead/Public Agency / Project Applicant

Location

Cities
Capitola
Counties
Santa Cruz
Regions
Citywide
Parcel #
APN 037-101-68; APN 037-211-31
Other Location Info
Cunnison Lane and Soquel Dr, connecting the Cunnison Well Site (APN 037-101-68) to the Tannery Well Site (APN 037-211-31)

Notice of Determination

Approving Agency
Soquel Creek Water District
Approving Agency Role
Lead Agency
Approved On
County Clerk
Santa Cruz
Final Environmental Document Available at
Soquel Creek Water District, 5180 Soquel Drive, Soquel, CA 95073

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
Yes (Addendum to Environmental Impact Report)
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Land Use and Climate Innovation (LCI) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit LCI’s Accessibility Site.