Soquel Creek Water District Well Master Plan
9 Documents in Project
Summary
SCH Number
2006072018
Lead Agency
Soquel Creek Water District
Document Title
Soquel Creek Water District Well Master Plan
Document Type
NOP - Notice of Preparation of a Draft EIR
Received
Present Land Use
Land Use: Undeveloped, 5000,000 gallon water storage tank, vacant, County park
Zoning: C-2 (Community Commercial), R-1 (Single Family Residential), RA (Residential Agricultural District), C-1 (Neighborhood Commercial), PR (Parks, Recreation, and Open Space)
Document Description
The Soquel Creek Water District (SqCWD) is pursuing a Well Master Plan (WMP) project to improve redundancy and flexibility in the SqCWD's water system while redistributing pumping away from coastal areas and thus, reduce the potential for saltwater intrusion. The WMP calls for the installation of three new groundwater production wells (O'Neill Ranch, Cunnison Lane or Austrian Way, and Granite Way-Aptos Village), the Cunnison Lane and Austrian Way site are alternate sites and thus, only one of these sites will be chosen for well construction and development. With the exception of the Granite Way-Aptos Village site which would connevy to an existing treatment plant, iron and manganese removal treatment plants would be constructed at all proposed well sites. Additional infrastructure improvements would include pipeline installation to connect to existing water supply mains, drainage infrastructure, and sanitary sewer mains in the vicinity of the well sites.
Contact Information
Name
Jeff Gailey
Agency Name
Soquel Creek Water District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Santa Cruz
Cross Streets
41st Ave/Soquel Dr; Cunnison Ln/Soquel Dr; Granite Wy/Cathedral Dr; Polo Grounds Reg Park
Total Acres
5 acres
Parcel #
030-341-10, 037-101-48, 040-461-06, 041-201-04, 041-011-20
State Highways
1, 17
Railways
SPRR
Waterways
Soquel Creek, Aptos Creek, Trout Gulch, Unnamed tributaries to Soquel Creek
Other Location Info
Soquel, Aptos
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Coastal Commission (CCC), California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 5 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Coast Region 3 (RWQCB), Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Loans and Grants
Development Types
Water Facilities
Local Actions
Other
Project Issues
Aesthetics, Air Quality, Coastal Zone, Cultural Resources, Cumulative Effects, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Septic System, Sewer Capacity, Transportation, Vegetation, Wetland/Riparian, Wildlife, Other
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.