Big River Watershed Restoration - Proposition 40 - River Parkways Grant Project, Supplement 02

10 Documents in Project

Summary

SCH Number
2006072012
Lead Agency
California Department of Parks and Recreation
Document Title
Big River Watershed Restoration - Proposition 40 - River Parkways Grant Project, Supplement 02
Document Type
NOD - Notice of Determination
Received
Posted
9/8/2014
Present Land Use
Timberland Production (TPZ) (Mendocino County General Plan Coastal Element Nov. 5, 1985, Revised March 11, 1991)
Document Description
In support of the original nature of the proposed work, this supplement to the Mitigated Negative Declaration incorporates an additional 1.46 miles of former logging road along the M2 road, including seven additional stream channel crossings. Work related to these efforts will: -Remove outside berms along road and use material to outslope road surface; -Deposit excess fill on former landings or skid roads, or within Big River quarry. -Eliminate inboard ditches; -Remove existing culverts, road fill, and excess sediment within stream channels; -Apply appropriate erosion control materials and methods; -Monitor and maintain erosion controls and remove invasive plant species; -Revegetate, as necessary, with native plants salvaged from the site.

Contact Information

Name
Renee Pasquinelli
Agency Name
Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Counties
Mendocino
Cross Streets
M-1 (Big River Haul Road)
Zip
95460
Total Acres
1117
Parcel #
119-290-04, 119-440-01
State Highways
Hwy 1
Railways
No
Airports
Little River Airport
Schools
Mendocino ES
Waterways
Big River
Township
17N
Range
17W
Section
29
Base
MDB&M
Other Location Info
City/Nearest Community: Mendocino
Other Information
Section: 31, 24, 25, 26, 28, 29, 30, 34, 35

Notice of Determination

Approving Agency
California Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print