Well 5636-2 Redrill

2 Documents in Project

Summary

SCH Number
2006071076
Lead Agency
Coachella Valley Water District (CVWD)
Document Title
Well 5636-2 Redrill
Document Type
NOD - Notice of Determination
Received
Posted
9/20/2006
Present Land Use
Residential GP: Medium Density Residential
Document Description
The Well 5636-2 Re-Drill project includes drilling, casing, testing, and developing a 1,500 gallon-per-minute (gpm) domestic water well including the installation of a 250-horsepower motor, a 1,500 gpm pump, and other aboveground and underground appurtenances required to connect the well and pumping plan to the domestic water distribution system. Well 5636-2 will be located on the same half-acre site as the existing Well 5636-1. Well 5636-1 is no longer in service because of increasing amounts of sand in the water produced by the well. The purpose of the Well 5636-2 Re-Drill project is to replace Well 5636-1 and provide domestic water service to the Valley Pressure Zone which includes the Indian Wells area.

Contact Information

Name
Luke Stowe
Agency Name
Coachella Valley Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Miles Avenue / Washington Street
Zip
92210
Total Acres
0.50
State Highways
111, I-10
Railways
UPRR
Airports
Bermuda Dunes
Schools
La Quinta High School
Waterways
Coachella Valley Stormwater Channel
Township
5S
Range
6E
Section
24
Base
SB
Other Location Info
City/Nearest Community: Indian Wells

Notice of Determination

Approving Agency
Board of Directors of Coachella Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print