Shelter Pointe Hotel Expansion

3 Documents in Project

Summary

SCH Number
2006071037
Lead Agency
San Diego, Port of
Document Title
Shelter Pointe Hotel Expansion
Document Type
NOD - Notice of Determination
Received
Posted
10/17/2006
Present Land Use
Commercial Recreation (Port Master Plan)
Document Description
The proposed redevelopment project consists of the following: (1) relocating and upgrading the hotel restaurant, AJ's Waterside Grille, within the facility; (2) expanding and upgrading the existing restaurant space into a banquet room, adding approximately 4,000 square feet of meeting space; (3) constructing a new swimming pool near the existing pool located south of the main hotel building; (4) constructing two new three-story "guest wings" to the north of the existing hotel on the western portion of the existing surface parking lot with 158 rooms; (5) constructing a new parking structure at the northern end of the project site with a subsurface basement level, three above-grade levels, 253 spaces, and attached marina and housekeeping facilities; (6) enhanced ornamental landscaping consistent with existing vegetation; (7) the promenade adjacent to the project area will be enhanced with additional landscape, signage, bench seating, and public art; (8) a 45-foot corridor between the new guest wings and between the northern guest wing and the parking garage would provide view and public access to the Shelter Island Drive and San Diego Bay.

Contact Information

Name
John Helmer
Agency Name
San Diego Unified Port District
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
1551 Shelter Island Drive
Total Acres
9.85
State Highways
I-5
Airports
San Diego International Airport
Waterways
San Diego Bay

Notice of Determination

Approving Agency
San Diego Unified Port District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.