Lompoc Wind Energy Project

6 Documents in Project

Summary

SCH Number
2006071008
Lead Agency
Santa Barbara County
Document Title
Lompoc Wind Energy Project
Document Type
NOD - Notice of Determination
Received
Posted
2/17/2009
Document Description
Pacific Renewable Energy Generation LLC to construct the Lompoc Wind Energy Project, as follows: 06CUP-00000-00009 for a Conditional Use Permit allowing construction and operation of a wind energy generation facility that includes 65 wind energy turbines, each with a tower height of 262 ft blade of length of 135 ft, and overall height of 397 ft, an operation and maintenance facility, and a power substantion on property zoned AG-II-100, in compliance with Section 35.82.060 of the County Land Use and Development Code; 08VAR-00000-00003 for a Variance from setbak regulations, in compliance with Section 35.82.200 of the County Land Use and Development Code, to allow placing wind turbines one turbine blade length from certain property lines instead of the overall system height; and to certify the EIR (06EIR-00000-00004) pursuant to the State Guidelines for Implementation of CEQA. A power transmission line proposed for the project, which would run from the project substantion to the City of Lompoc, was analyzed in the EIR. However, the power line was not included in the project approval action by the Board of Supervisors, as it is under the sole permitting jurisdiction of the California Public Utilities Commission.

Contact Information

Name
John Day
Agency Name
Santa Barbara County
Contact Types
Lead/Public Agency

Location

Cities
Lompoc
Counties
Santa Barbara
Cross Streets
3525 to 5555 San Miguelito Road
Total Acres
2,950
Parcel #
083-080-004; 083-090-001 thru 004; 083-100-004, 007, 008; 083-250-011, 019
Railways
Southern Pacific
Airports
Vandenberg AFB
Waterways
San Miguelito Creek, Honda Creek

Notice of Determination

Approving Agency
Santa Barbara County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.