Nisqualli Road Street Improvement Project

2 Documents in Project

Summary

SCH Number
2006071007
Lead Agency
City of Victorville
Document Title
Nisqualli Road Street Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
11/1/2006
Present Land Use
Land uses vary from open areas to residential to industrial.
Document Description
Nisqualli Road exists primarily as a two-lane road with dirt shoulders that traverses a residential area in the southeasterly portion of the City of Victorville. Nisqualli Road extends in an east/west direction from just east of Hesperia Road to Mariposa Road which is adjacent to and parallels the I-15 Freeway. The City of Victorville General Plan (Circulation Element) designates Nisqualli Road as an Arterial roadway. Arterials have an 84-foot right-of-way with four traffic lanes, two parking lanes, and curb and gutter. The proposed road improvements will extend from about 200 feet westerly of Balsam Road easterly to a location about 300 feet westerly of Hesperia Road. From this point to Hesperia Road the existing road section will be repaved (rehabilitated). Total length of the proposed new roadway is approximately 12,160 lineal feet, or 2.30 miles. Minor property acquisition will be required along much of the road alignment, including some drive-way access to individual homes that have encroached into the proposed Nisqualli Road right-of-way.

Contact Information

Name
Sam McGlade
Agency Name
City of Victorville
Contact Types
Lead/Public Agency

Location

Cities
Victorville
Counties
San Bernardino
Cross Streets
Mariposa, Nisqualli, and Hesperia Roads
Total Acres
~ 20
State Highways
I-15
Railways
BNSF
Waterways
Mojave River
Township
5N
Range
4W
Section
27-30
Base
SBM

Notice of Determination

Approving Agency
City of Victorville
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print