City of Fort Bragg Downtown Streetscape Improvement Project Phase 3

Summary

SCH Number
2006068009
Public Agency
City of Fort Bragg
Document Title
City of Fort Bragg Downtown Streetscape Improvement Project Phase 3
Document Type
NOE - Notice of Exemption
Received
Posted
6/5/2006
Document Description
A project of the City of Fort Bragg for the installation of streetscape improvements on five key east/west collector streets in the Central Business District. The enhancements proposed for Pine Street, Laurel Street, Redwood Avenue, Alder Street, and Oak Street between Main Street (Highway 1) and Franklin Street include the installation of wider sidewalks, construction of bulb-outs at intersections with specialty paving at crosswalks, installation of street trees, benches, pedestrian-scale streetlights, bicycle racks, trash, and recycling receptacles. The project will also include road re-construction of Laurel Street between Main Street and Franklin Street to accommodate wider sidewalks, reconfigured parking, bulb-outs, and intersection improvements. This project is Phase 3 of the Downtown Streetscape Project.

Contact Information

Name
David Goble
Agency Name
City of Fort Bragg
Contact Types
Lead/Public Agency

Location

Cities
Fort Bragg
Counties
Mendocino

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15301(c)
Reasons for Exemption
Section 15301(c) of CEQA consists of the operation, repair, maintenance, permitting, leasing, licensing, or minor alteration of existing public or private structures, facilities, mechanical equipment, or topographical features, involving negligible or no expansion of use beyond that existing at the time of the lead agency's determination. Section (c) of 15301 allows for existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails and similar facilities (this includes road grading for the purpose of public safety). The proposed project is for the installation of streetscape improvements on five key east/west collector streets in the Central Business District within the City of Fort Bragg. The proposed improvements will have no impact on the vehicular capacity or function of the existing right-of-way and will meet all required design standards.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print