Fassler Avenue Residential Project

7 Documents in Project

Summary

SCH Number
2006062150
Lead Agency
Pacifica, City of (City of Pacifica)
Document Title
Fassler Avenue Residential Project
Document Type
NOD - Notice of Determination
Received
Posted
3/26/2018
Present Land Use
Z: Planned Development District with a Hillside Preservation District overlay. GP: Open Space Residential and Low-Density Residential

Document Description
Project includes the subdivision of airpsace and construction of a 24-unit condominium development. The proposed project development area consists of 53,627 sq. ft. (approx. 1.23 acres) on the 11.2 acre site. Site access is proposed by one vehicular entrance via Fassler Avenue in the form of a private circular driveway that would connect to all of the buildings as well as provide guest surface parking spaces. The proposed project would include a butterfly and hummingbird garden, an upper and lower picnic area, other open space areas, and a footpath that would provide connection between the open space areas and the western portion of the residential development.

Contact Information
Bonny O'Connor
City of Pacifica
1800 Francisco Boulevard
Pacifica, CA 94044

Phone : (650) 738-7341

Location

Coordinates
37°36'9.29"N 122°29'30.25"W
Cities
Pacifica
Counties
San Mateo
Cross Streets
Fassler Avenue
Zip
94044
Total Acres
11.2
Parcel #
022-083-020, 030
State Highways
Hwy 1
Schools
Ortega ES, Terra Nova HS
Waterways
Pacific Ocean

Notice of Determination

Approving Agency
City of Pacifica
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
1800 Francisco Blvd., Pacifica, CA 94044

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search