Final Environmental Impact Report for the Mishka's Cafe Project at the Dresbach-Hunt-Boyer Mansion Site, 604 Second Street, Davis, CA

5 Documents in Project

Summary

SCH Number
2006062052
Lead Agency
City of Davis
Document Title
Final Environmental Impact Report for the Mishka's Cafe Project at the Dresbach-Hunt-Boyer Mansion Site, 604 Second Street, Davis, CA
Document Type
NOD - Notice of Determination
Received
Posted
11/10/2008
Present Land Use
The project site is zoned Central Commercial and is designated in the General Plan as Retail Stores (Downtown Core).
Document Description
The Cit. of Davis and its Redevelopment Agency have approved the proposed Mishka's Café Project located on a portion of the historic Dresbach-Hunt-Boyer Mansion site at 604 Second St. in downtown Davis. The proposed project requires the approval of a Certificate of Appropriateness, Demolition Permit for a designated City Landmark, Design Review and Lot Line Adjustment applications, which are not part of the current review process. The proposed project would relocate and rehabilitate the existing tank house structure to the west side of the Mansion and remove the residual orange grove at 604 2nd St. to accommodate the construction of a new two-story, approx. 3,665 sf. commercial building between the Varsity Theatre and the Mansion. The new building would include a 1,660 sf. ground floor café with outdoor seating, 1,255 sf. of office space on the second floor, and a 750 sf. basement.

Contact Information

Name
Ken Hiatt
Agency Name
City of Davis Redevelopment Agency
Contact Types
Lead/Public Agency

Location

Cities
Davis
Counties
Yolo
Cross Streets
South side of Second Street between E and F Streets (604 Second Street)
Total Acres
~ 0.0459
Parcel #
070-243-01, 02
State Highways
I-80
Railways
Union Pacific
Schools
UC Davis, Davis Joint Unified School District
Waterways
Putah Creek

Notice of Determination

Approving Agency
Redevelopment Agency Board of the City of Davis
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print