Addendum to Yuba River Levee Repair Project Phase l and ll (2004) and Phase 4 Initial Studies/ Mitigated Negative Declorations (2006)

3 Documents in Project

Summary

SCH Number
2006062037
Lead Agency
Three Rivers Levee Improvement Authority
Document Title
Addendum to Yuba River Levee Repair Project Phase l and ll (2004) and Phase 4 Initial Studies/ Mitigated Negative Declorations (2006)
Document Type
NOD - Notice of Determination
Received
Posted
1/20/2012
Present Land Use
Open Space / Valley Agriculture

Document Description
This project to repair the existing levee by increasing the height of the levee, constructing slurry walls within the levee, constructing a seepage berm on the landside of the levee, and installing riprap on a segment of the levee to increase flood protection.

Contact Information
Paul Brunner
Three Rivers Levee Improvement Authority
1114 Yuba Street, Suite 218
Marysville, CA 95901

Phone : (530) 749-5679

Location

Cities
Marysville
Counties
Yuba
Cross Streets
SR-70, Shad Pad Road, Simpson Lane
Zip
95901
Total Acres
4
State Highways
SR-70
Railways
UPRR
Waterways
Yuba River
Section
Unsect
Other Location Info
City/Nearest Community: Linda

Notice of Determination

Approving Agency
Three Rivers Levee Improvement Authority
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Three Rivers Levee Improvement Authority 1114 Yuba Street, Suite 218 Marysville, CA 95901

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print