Class 1* Permit Modification of Ecology Control Industries, Richmond - Closure Plan Changes
3 Documents in Project
Summary
SCH Number
2006062014
Lead Agency
California Department of Toxic Substances Control
(DTSC)
Document Title
Class 1* Permit Modification of Ecology Control Industries, Richmond - Closure Plan Changes
Document Type
NOD - Notice of Determination
Received
Posted
2/1/2019
Present Land Use
Industrial
Document Description
The Dept. of Toxic Substances Control adopted and Addendum to the previous Negative Declaration and approved the modifications of the Ecology Control Industries Richmond facility Standardized Harzardous Waster Permit, effective Nov. 27, 2018. The facility recycles drained Underground Storage Tanks (USTs) previously used to store gasoline or diesel fuel. Tanks and containers that are designated as Non-Resource Conservation and Recovery Act hazardous waste are shipped on a Uniform Hazardous Waste Manifest. The facility accepts empty tanks and tank appurtenances as Non-RCRA Hazardous-waste solid (empty storage tanks).
Contact Information
Name
Gary Hammond
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Richmond
Counties
Contra Costa
Cross Streets
255 Parr Boulevard
Zip
94801
Total Acres
9
Parcel #
408-090-028
Township
2
Range
5W
Section
36
Base
Diablo
Other Location Info
255 Parr Blvd, Richmond, CA 94801
Notice of Determination
Approving Agency
Dept. of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.