Middle Chiquita Recycled Water Facilities (Project); Water Recycling Funding Program (WRFP) No. 3925-030

26 Documents in Project

Summary

SCH Number
2006061140
Lead Agency
Orange County
Document Title
Middle Chiquita Recycled Water Facilities (Project); Water Recycling Funding Program (WRFP) No. 3925-030
Document Type
NOD - Notice of Determination
Received

Document Description
The District is proposing the construction of four reservoirs, two for domestic water use and two for non-domestic (recycled) use, to store treated the recycled water from the Chiquita Water Reclamation Plant. The reservoirs would be circular steel welded tanks. The tanks would have a heights of 32 feet, would be 106 feet in diameter, and would be constructed with aboveground welded steel plates. The site drainage from each reservoir would be collected in on site catch basins and conveyed through storm drain piping or channels to existing natural drainage courses. Pipe outlets would be protected with rock riprap energy dissipaters to reduce any impacts to the drainage channels.

Contact Information
Christine Day
State Water Resources Control Board
Div. of Financial Assistance 1001 I Street, 16th Floor
Sacramento, CA 95814

916 319-9440

Location

Cities
San Juan Capistrano San Clemente Mission Viejo Dana Point
Counties
Orange
Cross Streets
I-5, SR-74
Zip
92693
Total Acres
92,000
State Highways
I-5, SR-74, SR-241
Railways
OCTA Metrolink
Airports
Marine Corps Base-Camp Pendleton
Waterways
San Juan Creek, San Mateo Creek and tributaries
Other Location Info
Communities: Ladera Ranch, Coto de Caza

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
N/A

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes