Addendum to FEIR 589 (The Ranch Plan) and FEIR 584 (NCCP/MSAA/HCP for Souther Subregion. Implementation of the Trampas Canyon Dam and Reservoir
30 Documents in Project
Summary
SCH Number
2006061140
Lead Agency
Orange County
Document Title
Addendum to FEIR 589 (The Ranch Plan) and FEIR 584 (NCCP/MSAA/HCP for Souther Subregion. Implementation of the Trampas Canyon Dam and Reservoir
Document Type
NOD - Notice of Determination
Received
Posted
11/16/2017
Present Land Use
PC - Planned Community for 22,815 acres in RMV ownership and existing General Plan designations within unincorporated areas of County.
Document Description
Project, which proposes to reconstruct the existing Trampas Canyon Dam and Reservoir from its current use as a retention facility for tailings from the sand mining operation to a reservoir for storage of 5,000 acre feet of recycled water, was approved in Nov. 2015. FEIR 584 and FEIR 589 address the anticipated development in the Project study area; however, an Addendum was prepared because the amount of imported material increased. The addendum analyzed the potential differences between the impacts evaluated in FEIR 584 and FEIR 589 and those that would be associated with the development of the Trampas Canyon Dam and Reservoir Project, as proposed. SMWD determined that none of the triggers that require a new environmental document exist.
Contact Information
Name
Don Bunts
Agency Name
Santa MArgarita Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Juan Capistrano
Counties
Orange
Cross Streets
I-5, SR-74
Zip
92693
Total Acres
92,000
State Highways
I-5, SR-74, SR-241
Railways
OCTA Metrolink
Airports
Marine Corps Base-Camp Pendleton
Waterways
San Juan Creek, San Mateo Creek and tributaries
Notice of Determination
Approving Agency
Santa Margarita Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.