"F" Street Alignment (Cow Camp Road to Oso Parkway)

30 Documents in Project

Summary

SCH Number
2006061140
Lead Agency
Orange County
Document Title
"F" Street Alignment (Cow Camp Road to Oso Parkway)
Document Type
NOD - Notice of Determination
Received
Posted
6/8/2015
Present Land Use
PC - Planned Community for 22,815 acres in RMV ownership and existing General Plan designations within unincorporated areas of County.
Document Description
The project will construct a modified rural secondary highway from Cow Camp Road to Oso Parkway, at the terminus of State Route -241 (SR-241) in Orange County, which will consist of two 12-foot through lanes with 8-foot shoulders in both directions and a median. Storm water conveyance facilities will be provided adjacent to the roadway. A paved 10-foot-wide pedestrian and bicycle multi-purpose pathway will be provided on the southbound side of the roadway. The roadway will have a design speed of 70 mph and a posted speed limit of up to 65 mph.

Contact Information

Name
Darren Bradford
Agency Name
RWQCB-San Diego Region
Contact Types
Lead/Public Agency

Location

Cities
San Juan Capistrano
Counties
Orange
Cross Streets
I-5, SR-74
Zip
92693
Total Acres
92,000
State Highways
I-5, SR-74, SR-241
Railways
OCTA Metrolink
Airports
Marine Corps Base-Camp Pendleton
Waterways
San Juan Creek, San Mateo Creek and tributaries
Other Location Info
Communities: Ladera Ranch, Coto de Caza

Notice of Determination

Approving Agency
RWQCB-San Diego Region
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print