Zone of Benefit No. 8 Pipelines Project

2 Documents in Project

Summary

SCH Number
2006061136
Lead Agency
Rancho California Water District
Document Title
Zone of Benefit No. 8 Pipelines Project
Document Type
NOD - Notice of Determination
Received
Posted
8/14/2006
Present Land Use
Rural Mountainous (RM-10), defined as single-family residences with a minimum lot size of 10 acres Z: Single Family Residential
Document Description
The proposed project consists of the construction and operation of approximately 22,140 lineal feet of 8-inch and 12-inch diameter potable water pipelines and appurtenances within existing paved streets in RCWD's 2550 and 2850 Pressure Zones. The project is anticipated to include asphalt cutting and removal, trench excavation, installation of pipeline, trench backfilling, trench compacting, and asphalt replacement. In lieu of trench excavation, portions of the pipeline will be installed by boring and jacking underneath stream crossings at four different locations. The purpose of the project is to provide domestic water service to existing and planned residential development in the project area.

Contact Information

Name
Andrew L. Webster
Agency Name
Rancho California Water District
Contact Types
Lead/Public Agency

Location

Cities
Murrieta
Counties
Riverside
Zip
92562
Waterways
Los Alamos Canyon and unnamed tributary, Tenaja Canyon, and De Luz Creek
Township
7S
Range
4W, 5W
Section
18,19,
Base
SBM
Other Information
Sections: 23, 24, 29, 30, 31

Notice of Determination

Approving Agency
Rancho California Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.