Christ the King Lutheran Church and Pre-school - P05-09

2 Documents in Project

Summary

SCH Number
2006061032
Lead Agency
City of Santee
Document Title
Christ the King Lutheran Church and Pre-school - P05-09
Document Type
NOD - Notice of Determination
Received
Posted
10/2/2006
Present Land Use
Existing Residential Duplex
Document Description
The project is a Conditional Use Permit (P05-09) for a construction and use of a 20,900 square foot church and pre-school (90 children) on a 4-acre portion of a larger 40.49-acre property located south of Ramhaven Lane. The proposed structure includes a 250 seat church sanctuary, fellowship hall (7,400 sq. ft.), administrative offices, classrooms, a state-licensed pre-school (90 students and 13 staff), an outdoor play area (7,413 sq. ft.), and parking lot for 131 cars. The internal vehicular circulation plan includes a drop-off zone for access to the building. The existing unimproved Mesa Road would be improved about 900 feet along the project frontage to provide two points of access. An existing drainage course will be altered through relocation and re-vegetation. Other project design features include a stormwater detention basin and columbarium.

Contact Information

Name
Kevin Mallory
Agency Name
City of Santee
Contact Types
Lead/Public Agency

Location

Cities
Santee
Counties
San Diego
Cross Streets
Ramhaven Lane
Total Acres
4
Parcel #
386-070-26
State Highways
SR-125
Airports
Gillespie Field
Schools
Yes

Notice of Determination

Approving Agency
Santee City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.