Plaza Specific Plan (St. Jude Medical Office Building, Phase 2)

4 Documents in Project

Summary

SCH Number
2006061026
Lead Agency
City of Fullerton
Document Title
Plaza Specific Plan (St. Jude Medical Office Building, Phase 2)
Document Type
NOD - Notice of Determination
Received
Posted
12/10/2007
Present Land Use
The City's General Plan designation for the site is Commercial, and the Zoning Map designates the site as General Commercial (C-2). The Floor Area Ratio (FAR) for the Commercial land use designation ranges from 0.25 to 0.35 square feet of building area per square foot of land. The FAR for the C-2 designation is 0.35. The proposed project would increase the FAR well above the allowed level; therefore, a general plan revision and zoning amendment would be required.
Document Description
The project consists of a 97,895 sf medical and administrative office building, a 9-level (7 levels above grade, 2 levels below grade) parking structure with 481 off-street parkign spaces; a visitor drop-off area, service areas, and landscape areas. The access to the project site is to be provided by an existing driveway off of Valencia Mesa Dr., a new driveway off of N. Harbor Blvd., and a redesigned driveway off of Laguna Road.

Contact Information

Name
Joan Wolff
Agency Name
City of Fullerton
Contact Types
Lead/Public Agency

Location

Cities
Fullerton
Counties
Orange
Cross Streets
North Harbor Boulevard and Bastanchury Road
Zip
92835
Total Acres
1.12
Parcel #
028-641-16, 028-641-17
State Highways
SR-57, SR-91, I-5
Airports
Fullerton Municipal
Schools
Fullerton School District, Fullerton Joint Union HS District
Waterways
Brea Dam
Base
LdGrant

Notice of Determination

Approving Agency
City of Fullerton
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print