Kinsey Ranch Seasonal Bridge Project (Lake or Streambed Alteration Agreement No. 1600-2016-0491-R1)

4 Documents in Project

Summary

SCH Number
2006052176
Lead Agency
Humboldt County
Document Title
Kinsey Ranch Seasonal Bridge Project (Lake or Streambed Alteration Agreement No. 1600-2016-0491-R1)
Document Type
NOD - Notice of Determination
Received
Posted
12/27/2016
Present Land Use
PLU: The parcels together form a +/-7,000 acre ranch which has been in the cattle business since the early 1900s. The bridge placement is accessory to this use. GP and Z: Agriculture Exclusive (AE) and Timber Producation Zone (TPZ). AE

Document Description
Project is limited to one encroachment to install and remove a temporary rail car bridge across the East Branch of the South Fork Eel River annually. The bridge will be in place during the low flow season, with installation and removal occurring in response to streamflow within the river. Annual work for the bridge installation and removal will include construction of abutments using native gravel, placement of the bridge, removal of the bridge, and grading of the abutments and approaches to reestablish natural pre-installation gravel bar.

Contact Information
David Manthorne
California Department of Fish and Game
619 Second Street
Eureka, CA 95501

Phone : (707) 441-5900

Location

Counties
Humboldt
Cross Streets
Project site is +/-2 miles outside of Humboldt County
Zip
95542
Parcel #
223-075-001, -02
State Highways
US HWY 101
Waterways
East Branch of the South Fork of the Eel River
Township
4s
Range
4e
Section
32
Base
HBM
Other Location Info
Benbow

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
619 Second Street, Eureka, CA 95501

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search