DN-199 Rock Outcrop Removal Project

2 Documents in Project

Summary

SCH Number
2006052167
Lead Agency
California Department of Transportation, District 3
Document Title
DN-199 Rock Outcrop Removal Project
Document Type
NOD - Notice of Determination
Received
Posted
9/29/2006
Present Land Use
Transportation/Open Space
Document Description
The California Department of Transportation is proposing to remove rock outcroppings at various locations within a 0.3 mile segment to achieve a two to three-foot increase in roadway width on SR-199. Construction activities will consist of roadway rehabilitation and rock chiseling at various locations within the project area and construction of new roadbed section within the widened area. The department has identified 11 specific locations within the project area where the work would take place. Along with the specific locations, the department has ranked the priority of each specific location in a rank from 1 to 4 with 1 being the locations with the highest priority for work to be done. Work is proposed on a 24/7 schedule due to the narrow work area that lacks shoulders for room for vehicles to pass.

Contact Information

Name
Susan D. Bauer
Agency Name
Department of Transportation, District 3
Contact Types
Lead/Public Agency

Location

Counties
Del Norte
Cross Streets
SR-199 and Patrick Creek Lodge
Zip
95543
State Highways
State Highway 199
Waterways
Smith River
Other Location Info
City/Nearest Community: Gasquet

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print