Manteca Wastewater Quality Control Facility Master Plan and Collection System Master Plan 2005 Update

4 Documents in Project

Summary

SCH Number
2006052164
Lead Agency
Manteca, City of (City of Manteca)
Document Title
Manteca Wastewater Quality Control Facility Master Plan and Collection System Master Plan 2005 Update
Document Type
NOD - Notice of Determination
Received
Posted
2/13/2008
Present Land Use
BIP (Business Industrial Park), GC (General Commercial), HDR (High Density Residential), LDR (Low Density Residential), LI (Light Industrial), MDR (Medium Density Residential), NC (Neighborhood Commercial), P (Park), PQP (Public/Quasi-Public), UR (Urban Reserve)

Document Description
The proposed project would incrementally increase the treatment capacity of the WQCF from 9.87 million gallons per day (mgd) to 27 mgd average dry weather flow (ADWF), increase wastewater effluent discharges to the San Joaquin River, result in discharge of wastewater effluent on urban and agricultural lands, result in minor improvements to existing sewer lines, and result in the construction of three new trunk sewers measuring a total of approximately 21 miles.

Contact Information
Phil Govea
City of Manteca
1001 W. Center Street
Manteca, CA 95337

Phone : (209) 239-8463

Location

Cities
Manteca
Counties
San Joaquin
Regions
Citywide
Cross Streets
Airport Way and Yosemite Avenue
Zip
95337
State Highways
120, 99
Railways
UPRR
Schools
Sierra High School, Yosemite Elementary School
Waterways
San Joaquin River

Notice of Determination

Approving Agency
City of Manteca
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
1001 West Center St., Manteca, CA 95337

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print