Del Oro Phase 1 Inter-Tie Project

4 Documents in Project

Summary

SCH Number
2006052144
Lead Agency
Butte County
Document Title
Del Oro Phase 1 Inter-Tie Project
Document Type
NEG - Negative Declaration
Received
Present Land Use
Primarily rural residential development and vacant land/ various/ various
Document Description
The facilities and infrastructure required to convey treated water from the existing Lime Saddle intake through the WTP to the north zone of the system under Phase 1 include: 1. Modification of the existing lake intake and single submersible pump to include larger twin 16" diameter lake intake structures and a skid-mounted 125 hp submersible pump. 2. Installation of an 8-inch discharge pipe and casing. 3. Modification to the above ground manifold piping and the installation of new electrical switchgear. 4. Modification of the existing WTP to treat initially 625 GPM for service demand. 5. Installation of up to a 16" water main along 2.5 miles of Pentz Road. 6. Installation of a 300,000 gallon storage tank and booster pumps. 7. The 10,000 gallon hydropneumatic tank and new booster pump with related electrical will be relocated from the Mountain Oaks WTP to the existing north zone storage tank facility.

Contact Information

Name
Stacey Jolliffe
Agency Name
Butte County
Contact Types
Lead/Public Agency

Location

Cities
Paradise
Counties
Butte
Cross Streets
Pentz Road
Zip
95969
Total Acres
2.5 linear mi
Parcel #
numerous
Waterways
Lake Oroville/ Feather River
Other Location Info
Near Lime Saddle

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Cal Fire, California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 3 (DOT), California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Redding Region 5 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Office of Historic Preservation, Resources Agency, Resources, Recycling and Recovery, State Water Resources Control Board, Divison of Financial Assistance, Department of Water Resources
State Reviewing Agency Comments
Department of Water Resources
Development Types
Water Facilities (2.5 mile pipeline)(Type Water Line), Other (1000 GPM WTP)
Local Actions
Use Permit
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Schools/Universities, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print