Sacramento River Bank Protection Project, Five Critical Erosion Sites at River Miles L 26.9L, 34.5R, 72.2R, 99.3R, 123.5

2 Documents in Project

Summary

SCH Number
2006052103
Lead Agency
Central Valley Flood Protection Board
Document Title
Sacramento River Bank Protection Project, Five Critical Erosion Sites at River Miles L 26.9L, 34.5R, 72.2R, 99.3R, 123.5
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2006
Present Land Use
Open Space, Flood Zone
Document Description
The State of California Reclamation Board in partnership with the U.S. Army Corps of Engineers (Corps) and (Reclamation Board) in the Sacramento River Bank Protection Project propose to implement bank protection measures to prevent ongoing streambank erosion at five critically eroding sites along the Sacramento River. The five sites are River Miles (RM) 26.9L, RM 34.5L, RM 72.2R, RM 99.3R, and RM 123.5L along the Sacramento River in Yolo, Sacramento, and Sutter counties. These five sites are among 24 critical erosion sites in Governor Schwarzenegger's February 24, 2006 Declaration of State of Emergency of California Levee System, and March 7, 2006 Executive Order S-01-06. Erosion into the banks at these sites requires immediate work to prevent levee failure. The proposed bank protection measures would include: (1) protecting the toe and upper slopes of the bank with rock revetment; (2) establishing a berm around the mean summer water level (MSWL) to provide aquatic habitat during lower and higher river stages in winter and spring; (3) placing instream wood material (IWM) and brush bundles for aquatic habitat; and (4) planting pole and container plantings to stabilize the bank and provide riparian habitat.

Contact Information

Name
Deborah Condon
Agency Name
State Reclamation Board
Contact Types
Lead/Public Agency

Location

Cities
West Sacramento
Counties
Sacramento, Sutter, Yolo
Cross Streets
River Rd.; Courtland Rd. @ S. River Rd.; Hwy. 45 @ E11; Meridian Rd. @ Wood Rd.
Total Acres
8.93
State Highways
160, 45, I-5
Waterways
Sacramento River
Other Location Info
City/Nearest Community: Walnut Grove, Courtland, Knights Landing, and Grimes

Notice of Determination

Approving Agency
State Reclamation Board
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print