Northridge Grove Project, SAA # 1600-2014-0148-R2
3 Documents in Project
Summary
SCH Number
2006052101
Lead Agency
City of Citrus Heights
Document Title
Northridge Grove Project, SAA # 1600-2014-0148-R2
Document Type
NOD - Notice of Determination
Received
Posted
8/29/2014
Document Description
The California Department of Fish and Wildlife is executing Lake or Streambed Alteration Agreement number 1600-2014-0148-R2 pursuant to Section 1602 of the Fish and Game Code to the project applicant, Northridge Grove 46 LLC. The project is limited to the following; the placement of two clear span metal railcar style bridges. One bridge measures 63' x 69', the second measures 59' x 39' feet. Concrete abutments will be installed above the ordinary high water mark, and outside of the riparian area. Permanent impacts associated with the bridge total 0.20 acres, temporary impacts total 0.15 acres. In addition to the bridges, one 24" storm drain will be added to the banks of the Brooktree Creek. Approximately 0.25 ton of rock slope protection (RSP) will be added to the base of the storm drain to prevent erosion.
Contact Information
Name
Amy Kennedy
Agency Name
CDFW North Central Region
Contact Types
Lead/Public Agency
Phone
Location
Cities
Citrus Heights
Counties
Sacramento
Cross Streets
Madison Avenue and Farmgate Avenue
Zip
95610
Total Acres
7.09
Parcel #
233-0560-005, 007
State Highways
I-80
Schools
Skycrest ES, San Juan HS
Waterways
Arcade Creek
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.