City of Tracy / Semitropic Water Storage District Pilot Water Banking Project

3 Documents in Project

Summary

SCH Number
2006052049
Lead Agency
City of Tracy
Document Title
City of Tracy / Semitropic Water Storage District Pilot Water Banking Project
Document Type
NOD - Notice of Determination
Received
Posted
6/22/2006
Document Description
The City of Tracy seeks to increase water supply reliability through banking of surplus surface water supplies in the Semitropic Water Bank. This Pilot Project is proposed in which Tracy would deliver 1,000 acre-feet (AF) of its surplus Central Valley Project (CVP) supplies to Semitropic Water Bank. Of the 1,000 AF, 100 AF would be returned to Tracy as soon as reasonably possible, 800 AF would remain in storage until called upon by Tracy for up to 10 years, and 100 AF would be permanently left behind in the aquifer underlying Semitropic. The purpose of this Pilot Project is to go through the processes recharging, storing, and recovering supplies in the Semitropic Water Bank. This Pilot Project would be done to provide information and understanding in anticipation of a potential long-term water banking agreement between both parties. All water conveyance is through existing facilities and there is no construction required for this project.

Contact Information

Name
Steve Bayley
Agency Name
City of Tracy
Contact Types
Lead/Public Agency

Location

Cities
Tracy
Counties
Kern, San Joaquin

Notice of Determination

Approving Agency
City of Tracy
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print