Lake and Streambed Alteration Agreement No. R1-06-0338 Maple Creek/Big Lagoon Road Decommissioning and Erosion Prevention Project

46 Documents in Project

Summary

SCH Number
2006052041
Lead Agency
Fish and Game (HQ) Environmental Services
Document Title
Lake and Streambed Alteration Agreement No. R1-06-0338 Maple Creek/Big Lagoon Road Decommissioning and Erosion Prevention Project
Document Type
NOD - Notice of Determination
Received
Posted
8/14/2006
Document Description
The operator intends to alter the streambed to restore steelhead migration to the Carpinteria Creek watershed, by removing four fish barriers, all Arizona concrete crossings, and replacing them with 3 span bridges, on three properties. Bliss: The project consists of removing the existing crossing, replacing with a new span bridge with abutments outside the banks. The invert will be graded for 500 linear feet to prevent head cutting. One ungrouted rock check structure is required, using 3 to 4 ton imported boulders. Cate School: The existing crossing will be replaced with a new 70 foot span, with abutments outside the banks along the same alignment. Downstream of the crossing, an eroding bank will be repaired by sing biotechnical stabilization, consisting of ungrouted rock toe protection, with bio-D blocks above the rock. Raya: Two concrete crossings will be removed and replaced with one clear span bridge at the upstream crossing location.

Contact Information

Name
Holly Sheradin
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Carpinteria

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print