Whitelock Neighborhood Electric Distribution Project

2 Documents in Project

Summary

SCH Number
2006052037
Lead Agency
Sacramento Municipal Utility District
Document Title
Whitelock Neighborhood Electric Distribution Project
Document Type
NOD - Notice of Determination
Received
Posted
8/4/2006
Present Land Use
According to the Laguna Ridge Specific Plan Land Use Diagram (2003), the substation site is located on land designated WTF (Water Treatment Facility). The subtransmission line would border land that is designated CCMU (Community Commercial Mixed Use), RD-20 (Multi-Family Residential 20 du/ac), RD-10 (Single-Family Residential 10 du/ac), CP (Community Parks), RD-5 (Single-Family Residential 5 du/ac), SC (Shopping Center), RD-7 (Single-Family Residential 7 du/ac), and PKY (Parkway).
Document Description
SMUD proposes to construct and operate a distribution substation and 69-kV subtransmission line that would be added to the SMUD electrical system. The main project features include: - Two 69-kV power transformers - Metal-clad switchgear - Six capacitor banks - Two switch poles - Two station battery banks - A new 2.1-mile-long single-circuit 69-kV subtransmission line that would connect the Whitelock substation to an existing 69-kV subtransmission line on Bruceville Road and on West Stockton Boulevard.

Contact Information

Name
Ron Scott
Agency Name
Sacramento Municipal Utility District
Contact Types
Lead/Public Agency

Location

Cities
Elk Grove
Counties
Sacramento
Cross Streets
Whitelock Pky, Hwy. 99, Elk Grove Blvd, Bilby Rd, Bruceville Rd, West Stockton Blvd.
Total Acres
0.62 substation
Parcel #
132-0270-017, 026; 132-0280-016, 015, 008; 132-0050-074, 075, 063, 064, 053, 054, 089, 079;
State Highways
SR-99
Railways
UPRR
Schools
23 schools and a proposed school site
Township
7N
Range
5E
Section
1, 2,
Base
MDBM
Other Information
Parcel Nos: 132-0290-002, 001, 003, 004, 038, 029, 030, 030 Sections: 3 or 1, 10, 11, and 12

Notice of Determination

Approving Agency
Sacramento Municipal Utility District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print