Secret Town Improvement Project

2 Documents in Project

Summary

SCH Number
2006052024
Lead Agency
Placer County Water Agency
Document Title
Secret Town Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
6/16/2006
Present Land Use
Vacant / Residential-Forest / Agriculture / Timberland (10 acre minimum lot area)
Document Description
PCWA is proposing to replace the approximately 2,500-foot-long Secret Town Pipeline, a piped section of the Boardman Canal. The proposed maintenance project entails replacing this existing 30-inch-diameter raw water pipeline that has been leaking and has had several failures in recent years. The pipeline would be replaced in two phases. Phase 1 involves replacing a 700-foot-long section of pipeline and 500 feet of downstream canal with 1,600 feet of new pipeline. These improvements will predominantly be within the unpaved Secret Town Road lying westerly of the Union Pacific Railroad tracks. Phase 2 of the project will replace the remaining upstream portion of the pipeline to the pipeline headworks east of I-80.

Contact Information

Name
Ken Powers
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency

Location

Counties
Placer
Cross Streets
I-80 and Magra Road
Zip
95713
State Highways
I-80
Railways
UPRR
Waterways
3 ephemeral drainages in project corridor
Township
15N
Range
10E
Section
7, 8
Other Location Info
City/Nearest Community: Gold Run

Notice of Determination

Approving Agency
Placer County Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print