WDCWA Davis Woodland Water Supply Project (California Endangered Species Act Incidental Take Permit No. 2081-2014-018-02 (ITP))
41 Documents in Project
Summary
SCH Number
2006042175
Lead Agency
City of Davis
Document Title
WDCWA Davis Woodland Water Supply Project (California Endangered Species Act Incidental Take Permit No. 2081-2014-018-02 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
7/1/2014
Present Land Use
Multiple land use designations.
Document Description
The Project will connect the existing WDCWA regional water system facilities to the proposed RD 2035 joint intake facility on the Sacramento River. Specifically, the Project includes installation of an untreated water pipeline, a new water treatment plant, and new treated water pipelines from the treatment plant to the cities of Davis and Woodland, and UC Davis.
The Project will result in temporary impacts to 10.3 acres of Giant garter snake (Thamnophis gigas) habitat. The project is expected to result in incidental take of Giant garter snakes, which is designated as a threatened species under the California Endangered Species Act. The ITP referenced above as issued by the Department of Fish and Wildlife authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.
Contact Information
Name
Paul Hofman
Agency Name
CDFW North Central Region
Contact Types
Lead/Public Agency
Phone
Location
Cities
Davis, Woodland
Counties
Yolo
Cross Streets
Various
Zip
95616
Parcel #
Multiple parcels
State Highways
I-5
Railways
Sierra Northern
Airports
Sacramento Int'l
Waterways
Sacramento River, Cache Creek, Willow Slough, Willow Slough Bypass
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.