The Metropolitan Project DEIR

4 Documents in Project

Summary

SCH Number
2006042161
Lead Agency
City of Sacramento
Document Title
The Metropolitan Project DEIR
Document Type
NOD - Notice of Determination
Received
Posted
5/30/2008
Present Land Use
The project site is located in the Central Business District - Special planning district (C-3 SPD) on a 41,600 square foot site. The project is located in the Capitol View Protection Corridor and has been designed to be consistent with those standards. Existing vacant hotel and commercial buildings are currently located on the site.
Document Description
The proposed project site is located in the central business district in Downtown Sacramento. The proposed project includes development of five parcels on the southwest corner of the half block bounded by the alley to the north between 11th and J Streets. This Draft EIR is being recirculated to include a second hotel option per the request of the applicant subsequent to the release of the initial Draft EIR. The second option of the Metropolitan project would include a mixed-use hotel option involving the demolition of the existing structures on the site and construction of a mixed-use, residential condominium/hotel building with parking and includes a maximum of 190 residential units and 190 hotel rooms in a building similar to the Residential development option. A hotel lobby and restaurant would be located facing the corner of 10th and J Streets behind a 25-foot outdoor plaza.

Contact Information

Name
Jennifer Hageman
Agency Name
City of Sacramento
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
10th and J Streets
Total Acres
955
Parcel #
006-0044-010-013
State Highways
I-5
Waterways
Sacramento River, American River

Notice of Determination

Approving Agency
City of Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print