Edge Wireless, LLC

3 Documents in Project

Summary

SCH Number
2006042121
Lead Agency
Humboldt County
Document Title
Edge Wireless, LLC
Document Type
NOD - Notice of Determination
Received
Posted
8/28/2009
Document Description
A modification to an existing Conditional Use Permit, Coastal Development Permit and Special Permit. The original permit allowed the construction of a 120 ft tall monopole support structure with several microwave antennas and dishes mounted at various elevations on the pole including a 120 sf prefabricated equipment building. The Modification will collocate new antennas on the existing 120 ft tall tower and construct a related ground based equipment building on new 10' x 20' concrete pad. The project for T-Mobile will install new antennas and microwave dish at the 100 ft elevation. No increase to the height is required. The site area will be within the existing 50' x 50' leased area which is fenced and gated. Access to the site will be via an existing access road off of Hilton Road. A Special Permit is required for Design Review.

Contact Information

Name
Trevor Estlow
Agency Name
Humboldt County Community Development Services
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Hilton Road and U.S. Hwy. 101
Zip
95555
Parcel #
519-311-21
State Highways
US 101
Waterways
Redwood Creek, Freshwater Lagoon, Pacific Ocean
Township
10N
Range
1E
Section
5
Base
HBM
Other Location Info
City/Nearest Community: Orick

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print