Folsom Drop Structure Modification Project

2 Documents in Project

Summary

SCH Number
2006042116
Lead Agency
City of Folsom
Document Title
Folsom Drop Structure Modification Project
Document Type
NOD - Notice of Determination
Received
Posted
8/31/2006
Present Land Use
Transportation corridor, local streets, and public parking facilities GP: Arterial Street (A), Historic District (HD), Open Space Conservation District (OSC) Z: Historic District (HD), Open Space Conservation District (OSC)
Document Description
The City of Folsom proposes to open the existing drop ramp structure, connecting the Natoma Crossing to the Leidesdorff Street Lid Structure, to vehicular traffic. The proposed improvements would include construction of a median approach to the ramp structure on Folsom Boulevard, relocating the existing entrance to the north Light Rail Park and Ride lot on Leidesdorff Street, installation of barriers, signs, and lighting on the ramp, parking stall re-striping, and associated sidewalk, curb, and gutter work. The project will provide a direct access to the light rail parking lots for southbound traffic on Folsom Boulevard north of the American River.

Contact Information

Name
Tom Garcia
Agency Name
City of Folsom
Contact Types
Lead/Public Agency

Location

Cities
Folsom
Counties
Sacramento
Cross Streets
Leidesdorff Street, Reading Street, and Folsom Boulevard
Zip
95630
State Highways
US 50
Railways
Sacramento Regional Transit
Schools
Pershing ES, Folsom Montessori, Kiddie Woods Pre-School, Notre D
Waterways
American River
Township
10N
Range
7E
Section
35
Base
Folsom
Other Information
Base: 7.5' USGS Quad. Schools: Dame, Sundance Montessori, Victory Christian ES.

Notice of Determination

Approving Agency
California Department of Transportation
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print