Antelope Transmission Project Segments 2 and 3, Stream Alteration Agreement No. 2008-0215-R4

5 Documents in Project

Summary

SCH Number
2006041160
Lead Agency
California Public Utilities Commission (CPUC)
Document Title
Antelope Transmission Project Segments 2 and 3, Stream Alteration Agreement No. 2008-0215-R4
Document Type
NOD - Notice of Determination
Received
Posted
4/20/2009
Present Land Use
Multiple (Linear Project)
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code for the Windhub Substation portion of the Antelope Transmission Project, Segments 2 and 3. Grading for the Windhub Substation will fill in a portion of an unnamed ephemeral stream. Fill material will be placed into approximately 1,000 linear feet of the blue-line ephemeral drainage ranging in size from 3-feet width by 2-feet depth to 15-feet width by 6-feet depth (~ 0.14 acre of permanent disturbance, and 889 cubic yards of fill). Sheet flow that originally cut the drainage will be re-directed into a new trapezoidal channel along three sides of the perimeter of the substation. The trapezoidal channel will connect to the drainage on the southeast corner of the property boundary with the placement of riprap and ~105 feet by 29 feet. Equipment used for construction includes a five-ton truck, loader/scraper, compactor, dump truck, grader, tractor/backhoe, and water truck.

Contact Information

Name
Annette Tenneboe
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Lancaster, Mojave, Palmdale, Tehachapi
Counties
Kern, Los Angeles
Parcel #
Multiple (linear project)
Other Location Info
Other Communites: Rosamond, Acton

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print