Water System Improvements
2 Documents in Project
Summary
SCH Number
2006041155
Lead Agency
California Department of Parks and Recreation
Document Title
Water System Improvements
Document Type
NOD - Notice of Determination
Received
Posted
1/24/2007
Present Land Use
Open Space/ Recreation
Document Description
The Department of Parks and Recreation proposes to complete water supply improvements to Andrew Molera State Park (AMSP) and Point Sur State Historic Park (PSSHP). The following is a brief summary of the proposed work:
- Replace the existing water supply well at AMSP that provides water for PSSHP.
- Connect the new supply well to the existing distribution waterline that conveys water from AMSP to PSSHP.
- Construct a new, approximately 150 square feet, wood framed well pump house to facilitate the required water delivery components.
- Reroute a portion of the existing waterline from the Ranch complex area in AMSP to the trail camp away from the edge of the Big Sur River.
- Abandon-in-place sections of existing waterline and replace with new waterline.
Contact Information
Name
Patricia DuMont
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency
Phone
Location
Cities
Carmel, Carmel-by-the-Sea
Counties
Monterey
Cross Streets
HWY 1 and Molera Road
Zip
93920
State Highways
HWY 1
Waterways
Big Sur River, Pacific Ocean
Notice of Determination
Approving Agency
California Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.