SIO Seawater/Storm Water Management Project

2 Documents in Project

Summary

SCH Number
2006041139
Lead Agency
University of California San Diego
Document Title
SIO Seawater/Storm Water Management Project
Document Type
NOD - Notice of Determination
Received
Posted
6/26/2006
Present Land Use
Primarily designated for academic use per UCSD's 2004 LRDP.
Document Description
The proposed project is located at the University of California, San Diego (UCSD) Scripps Institution of Oceanography (SIO), which is located west of North Torrey Pines Road and the main UCSD campus in the La Jolla community of the City of San Diego. The proposed project includes modifications to the following SIO building systems and campus utility connections: Hubbs Hall, the Experimental Aquarium, the Hydraulics Lab, Birch Aquarium, Southwest Fisheries Building, and five seawater storage/supply tanks which distribute seawater throughout the SIO area. The project would separate seawater and storm water that is currently commingled and would provide a system to monitor and evaluate the quality and quantity of seawater discharge from UCSD SIO. The project would enable compliance with the requirements of NPDES Order No. CA0107239 (which prohibits UCSD SIO from discharging non-storm water into a storm drain), and Order No. R9-2005-008 (which sets seawater pollutant discharge criteria).

Contact Information

Name
Catherine Presmyk
Agency Name
University of California San Diego
Contact Types
Lead/Public Agency

Location

Cities
La Jolla
Counties
San Diego
Cross Streets
La Jolla Shores Drive x Biological Grade
Zip
92093
State Highways
I-5, I-805
Railways
NCTD Coaster, Amtrak
Schools
La Jolla Country Day, Preuss
Waterways
Pacific Ocean
Township
15S
Range
4W
Base
La Jolla

Notice of Determination

Approving Agency
University of California, San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print