California Polytechnic State University, San Luis Obispo Photovoltaic Project

2 Documents in Project

Summary

SCH Number
2006041138
Lead Agency
California State University Trustees (California State University Board of Trustees)
Document Title
California Polytechnic State University, San Luis Obispo Photovoltaic Project
Document Type
NOD - Notice of Determination
Received
Posted
9/1/2006
Present Land Use
Occupied by Engineering West Building. Z: Public Facilities GP: Campus Instructional Core

Document Description
The proposed project includes the construction and installation of a 135 kw alternating current photovoltaic unit at California Polytechnic State University, San Luis Obispo. The unit would be installed on the roof of the existing Engineering West building and would serve to produce renewable energy once installed.

Contact Information
Joel Neel
California State University Board of Trustees
1 Grand Avenue
San Luis Obispo, CA 93407-0130

Phone : (805) 756-2193

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
California Polytechnic State University on top of Engineering West Building #21

Notice of Determination

Approving Agency
Trustees
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
CSU, San Luis Obispo AND CSU Chancellor's Office Design and Construction 401 Golden Shore Long Beach, CA 90802-4210

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.