West Artesia Boulevard Commercial Highway Planning Area Specific Plan

3 Documents in Project

Summary

SCH Number
2006041028
Lead Agency
City of Bellflower
Document Title
West Artesia Boulevard Commercial Highway Planning Area Specific Plan
Document Type
NOD - Notice of Determination
Received
Posted
8/16/2007
Present Land Use
Commercial, Light Industrial, and Residential. GP: Commercial, with the exception of two utility easements, which are designated as Open Space. Z: General Commercial (C-G).
Document Description
The Specific Plan proposes the development of two large-scale commercial retail stores. The Specific Plan area is currently developed, and includes various commercial, residential, and light-industrial land uses. At this time, no specific development projects are being proposed for the Specific Plan area. However, for the purpose of this EIR, a maximum development scenario has been created by the City to allow the City to most effectively analyze the potential environmental impacts of the Specific Plan. The maximum development scenario presents a maximum of approximately 307,000 square feet of general commercial uses, including two large-scale commercial retail stores, Major A and Major B, of approximately 150,000 square feet each; associated parking; and two smaller commercial buildings of approximately 3,600 square feet. As specific future development is proposed within the Specific Plan area, the City will review each project based on its compliance with the standards set forth in the Specific Plan.

Contact Information

Name
Brian K. Lee
Agency Name
City of Bellflower
Contact Types
Lead/Public Agency

Location

Cities
Bellflower
Counties
Los Angeles
Cross Streets
SR-91, Artesia Boulevard, Lakewood Boulevard, Downey Avenue
State Highways
91, 19

Notice of Determination

Approving Agency
City of Bellflower
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print