David Vineyard Conversion

2 Documents in Project

Summary

SCH Number
2006032131
Lead Agency
Napa County
Document Title
David Vineyard Conversion
Document Type
NOD - Notice of Determination
Received
Posted
8/11/2006
Present Land Use
AW (Agricultueal Watershed); AWOS (Agriculture Watershed & Open Space)
Document Description
The project includes earthmoving activity associated with development of a new vineyard, including installation of erosion control measures as detailed in Erosion Control Plan # 04081-ECPA, available for review at the Napa County Conservation, Development and Planning Department. Slopes range from 1% to 35%, with an average slope of 21%. Grading would consist of land smoothing, ripping and disking. There would be no off-site spoils. Water would be provided by a new well. Erosion control plan #04081-ECPA has been prepared and includes silt fencing, straw mulch, diversion ditches, drop inlets, straw bale dikes, earthen waterbars, rock slope protection and a permanent no-till cover crop. Total area proposed for vineyard project is 8.1 +/- acres on a 54.41-acre parcel located on the north side of Conn Valley Road approximately 3,200 feet southeast of its intersection with Rossi Road. The parcel is located in an Agricultural Watershed (AW) zoning district, with a Napa County General Plan designation of Agriculture, Watershed, and Open Space. Access would be from an existing road off of Conn Valley Road. No future projects are anticipated for the parcel at this time.

Contact Information

Name
Daniel Zador
Agency Name
Napa County Conservation Development & Planning Dept.
Contact Types
Lead/Public Agency

Location

Cities
St. Helena
Counties
Napa
Cross Streets
Conn Valley Road, Rossi Road
Zip
94574
Total Acres
8.1
Parcel #
025-180-034
State Highways
128
Waterways
Unnamed tributaries to Conn Creek, Conn Creek, Lake Hennessy
Township
8N
Range
4W
Section
30
Base
MDBM

Notice of Determination

Approving Agency
Napa County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.