Gold Run Pipeline Near Term Improvement Project

2 Documents in Project

Summary

SCH Number
2006032128
Lead Agency
Placer County Water Agency
Document Title
Gold Run Pipeline Near Term Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
5/5/2006
Present Land Use
Forestry Zoning District/ Mineral Reserve Combining District (20 acre min.)- Zoning/Agricultural District/ Timberland Production District (20 acre min.)- General Plan
Document Description
PCWA is proposing to replace an approximately 3,800-foot-long segment of the Gold Run Pipeline. The proposed maintenance project entails replacing this existing 30-inch diameter raw water pipeline that has been leaking and has had several failures in recent years. The pipeline would be replaced in two phases. Phase 1 involves replacing a 1,400-foot-long section within Gold Run Road and then moving into the Union Pacific Railroad access road. Phase 2 of the project involves replacing the remaining 2,400 feet of pipeline, from the northeasterly end of Phase 1 along the railroad access road and also a portion in Gold Run Road southwesterly of Phase 1.

Contact Information

Name
Ken Powers
Agency Name
Placer County Water Agency
Contact Types
Lead/Public Agency

Location

Counties
Placer
Regions
Unincorporated
Cross Streets
Gold Run and Lincoln Roads
Zip
95714
Total Acres
0.87
Parcel #
063-010-017-000
State Highways
I-80
Railways
UPRR
Waterways
Boardman Canal
Township
15N
Range
10E
Section
3,4
Base
MDBM
Other Location Info
Gold Run

Notice of Determination

Approving Agency
Placer County Water Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print